Today our driveway was graveled and our excavation was expanded to be house-sized. What a difference a day makes! The log I stood on for previous photos has been moved to the northeastern side of the property, the water tank for the first, decommissioned well has been moved to the southeastern side, and there are big hills of dirt everywhere -- including where the water tank used to be. Our stack of geofoam has grown, and there is a new stack at the front of the property among dirt hills.
minimalist modern home design, japanese minimalist design, small modern minimalist homes, minimal homes designs, housingdesignminimalis, minimalist style homes, minimalist houses small, japanese minimalist architecture
Thursday, September 27, 2012
Day 3: Driveway gravel and a HUGE hole
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment